This is by far our favorite and most satisfying step of a new construction project. The primary objective of this step is to finish up all water and gas supply piping, as well as waste water piping. Once this is completed we add the final fixtures including:
- Water Heater
- Sump Pump
- Hose Bibs
- Washer
- Faucets – Install all faucets for sinks, showers, and tubs.
- Laundry Tub
- Icemaker Water Line
- Dish Washer
- Sinks – Set all sinks, both pedestal and drop in style.
- Toilets
At this point all plumbing and gas lines will be checked for proper function as well as the added fixtures.